One of the World's Largest Off-Grid EV Truck Charging Sites: Built in Calgary!

Event Start:
April 3, 2025 4:00 PM
Event End:
April 4, 2025
Location:
**Building One of the World’s Largest Off-Grid EV Truck Charging Sites:** Come hear the story of how one of the [largest EV truck charging sites ](https://www.prologis.com/insights/success-stories/north-americas-largest-heavy-duty-ev-charging-hub-powered-microgrid)was developed from Calgary and deployed in the U.S.—all without a grid connection and completed in just 12 months! **Speaker: JT Steenkamp** **Vice President, Projects & Technology, Prologis** JT led the team that delivered the largest EV truck charging project in the U.S., featuring: * **9 MW of charging capacity** * **18 MWh of energy storage** * **3 MW of on-site power generation** Before Prologis, JT spent 10 years at Shell developing projects in energy storage, hydrogen, carbon capture, and EV infrastructure. He holds Bachelor’s and Master’s degrees in Engineering Physics from the University of Saskatchewan. 📅 **Date:** Thursday, April 3, 2025 📍 **Location:** The Energy Transition Center (112 4 Ave SW, East 15th Floor, Calgary, AB T2P 3N3) ⏰ **Time:** 4:00 PM 🎤 **Event Sponsor:** Avatar Innovations
Visit Event PageEvent Has Passed